020 3608 3976
Move-out cleaning · Basildon
Tenants, landlords and agents often mean slightly different things by “end of tenancy cleaning”. We avoid that confusion by agreeing the rooms, appliances, furnishings and deadline for your Basildon property in writing before the visit.

Planning the clean
A kitchen may look empty while food remains in the fridge or the oven is still warm. For a Basildon move-out, state which interiors are included and prepare each appliance safely.
Leaks, damaged seals and burnt enamel cannot be cleaned away. The written tenancy scope should distinguish those defects from suitable grease or limescale.
Preparing for handover
Add professional oven cleaning when racks and internal surfaces require degreasing. Remove food and personal cookware first.
Let removals finish before the final clean. Without a tenancy handover, one-off cleaning may be more appropriate.

Carpet extraction is separate from the normal vacuuming included in a room clean. If you need it, tell us which rooms are carpeted and show us any stains when you ask for a price.
It is best to clean carpets after boxes and movable furniture have gone. Once finished, keep shoes, movers and other contractors off the fibres while they dry. Drying time varies, so leave a comfortable gap before the inventory check rather than booking it immediately afterwards.
Cleaning can remove suitable dirt, but it cannot reverse worn fibres, burns or permanent colour loss. Photograph those areas before treatment so they are not confused with a cleaning issue.
Questions before booking
No. Agree preparation beforehand and follow appliance guidance for handling ice and water.
Allow cooking equipment to cool sufficiently for the agreed work.
Disconnection is not implied by an ordinary cleaning appointment; discuss inaccessible recesses separately.
No. A performance fault requires a separate repair assessment.
Keep the correct parts available and identify damage; do not discard equipment belonging to the rental.
Do not assume so. The suitable method depends on the component and its instructions.
Tell us the address, room count, condition, access arrangement and handover date.
