Electrician planning cable routes during a London home rewiring project

Alesta · Electrical rewiring in London

Rewiring planned around the property.

Carefully scoped circuit and whole-home rewiring, with routes, access, protection, testing and reinstatement responsibilities agreed before work begins.

☎ Call 020 3608 3976

Survey before cable routes

A rewire is a property project, not only an electrical task.

New cables must reach sockets, lighting points and fixed equipment through an existing building. The installation condition, room layout, desired outlets, floor and ceiling access, occupied areas and decorating programme all affect the safest and least disruptive plan.

We define whether the need is a single circuit, a partial upgrade or a full rewire. Testing and survey findings guide that scope; age alone does not prove that every cable must be replaced, while visible modern accessories do not confirm the concealed wiring is suitable.

Existing-installation assessment

Supply, consumer unit, earthing, circuit condition and accessible routes are reviewed.

Point and circuit schedule

Sockets, lights, appliances and specialist loads are mapped before work starts.

Cable route planning

Floor, ceiling, chase and service routes are coordinated with access and finishes.

Testing and certification

New work is inspected, tested and documented to the applicable scope.

Electrician reviewing a rewiring plan with homeowners in a London property

Common reasons customers call

When the existing wiring no longer suits the home.

Testing identifies widespread defects

Insulation, earthing or circuit arrangements show that local patching will not provide a sound result.

A renovation changes the layout

New kitchens, extensions or room uses need circuits and outlet positions planned together.

The property has too few usable points

Extension leads and overloaded arrangements reveal a need for a safer permanent design.

Old alterations are inconsistent

Multiple generations of undocumented work make isolation, testing and future maintenance difficult.

Why Alesta for rewiring

A coordinated plan for wiring and finishes.

Scope comes from evidence

Survey findings and intended use define whether work is local, partial or property-wide.

Routes are discussed

Access through floors, walls and ceilings is planned before chasing or lifting begins.

Occupied homes are considered

Phasing, temporary power, dust and room access are addressed in the programme.

Testing closes the work

Circuits are identified, inspected, tested and documented before handover.

A planned installation

How we carry out electrical rewiring.

Electrician terminating new labelled circuits at a modern consumer unit

Rewiring starts with the property and the intended result. We review available inspection information, current circuit arrangements, the rooms being altered and the number and position of required points. High-load equipment, smoke alarms, data, exterior supplies and future plans are considered early. In older London properties, construction type, listed details, shared access and restricted floor voids can materially affect the route and programme.

The electrician develops a circuit and point schedule, then confirms where cables can run. This may involve floorboards, ceiling voids, surface routes or chases. The scope states who moves furniture, lifts finishes, opens access and completes plastering or decoration. Occupied homes may need phases so essential power can be restored between visits, but temporary arrangements must remain safe and cannot always preserve every room in use.

During installation, the relevant supply is isolated and work areas are protected. Old circuits are disconnected in a controlled sequence and new cables, boxes and accessories are installed to the agreed design. Cable zones, support, mechanical protection and separation from other services are considered throughout. Any concealed defect or blocked route that changes the plan is shown before extra opening-up or material is authorised.

Each new circuit is inspected and tested before energisation. The consumer unit schedule and accessory identification are updated, and required certification is prepared for the completed scope. The electrician explains any excluded legacy circuit, outstanding building repair and limitation caused by inaccessible areas. A successful rewire is not simply new cable: it is an installation that matches present use, can be isolated clearly and leaves future electricians with reliable information.

Clear pricing

Electrical rewiring prices.

The total depends on property size, point schedule, access routes, occupation, consumer-unit work and reinstatement responsibilities.

Service scopePriceWhat affects the final price
Defined circuit rewireFrom £500Circuit length, points, route, access and making good
Partial property rewireQuoted after surveyRooms, retained circuits, phasing, access and testing
Whole-property rewireFrom £3,000Property size, point count, specification, occupation and finishes

Pricing context: Existing audited electrical data includes smaller rewiring scopes from several hundred pounds and whole-home projects from around £3,000. A survey and written specification are required for a reliable quote.

How the service works

From survey to tested new circuits.

01

Survey the installation and plans

We review circuit condition, room use, desired points and access constraints.

02

Agree routes, phases and finishes

The schedule defines openings, protection, power interruptions and making good.

03

Install, test and document

New circuits are completed, identified, tested and handed over with the applicable records.

Electrical rewiring FAQ

Before the rewiring project begins.

Useful answers about surveys, occupation, disruption, finishes and certification.

☎ Call 020 3608 3976
How do I know whether the whole property needs rewiring?

Inspection and testing should determine the condition and suitability of circuits. Age or old-looking accessories alone are not enough to define a full rewire.

Can we remain in the property during the work?

Sometimes, with careful phasing, but rooms may be unavailable and power will be interrupted. The property layout, family needs and project size determine whether occupation is practical.

Does rewiring include plastering and decorating?

Only when listed. Electrical work often requires access holes or chases; the scope must state who is responsible for making good and final decoration.

Can existing sockets or circuits be retained?

They may be retained if inspection, testing, design and compatibility support it. The electrician will identify what can remain and any limitation.

How long does a rewire take?

It depends on property size, point count, access, occupation and other trades. A phased flat differs greatly from an empty multi-storey house.

Will the new installation be certified?

Applicable inspection, testing and certification are provided for the completed electrical scope, with any notification requirements handled as agreed.

What affects the final price?

Property size, number of circuits and points, cable routes, consumer-unit work, access, occupation, specification and making good all affect the quote.

Planning an electrical rewire?

☎ Call 020 3608 3976