Flats & apartments
Check the apartment’s permitted equipment route.
STRATFORD · FURNITURE ASSEMBLY
New furniture, planned around the building.
A flat-pack delivery may fit inside the lift while the finished piece does not. Check the route and final location before arranging an assembly appointment around several large items.

STRATFORD IN PRACTICE

New furniture, planned around the building.
For a Stratford apartment, tell us about delivery access and any booking arrangements you have with the building. The handyman visit should be based on the products present, not a delivery that is still uncertain.
Building access arrangements cannot compensate for a wardrobe package still in transit. Check each product’s package count and visible condition before planning an appointment around several large items.
The delivery route and assembly space need separate consideration. A cabinet arriving as compact panels may need much more room to build and raise inside its final room.
Verify that every large package is onsite · Share any building delivery instructions · Measure the finished furniture footprint · Reserve a clear area for sorting panels
BUILD A REALISTIC LIST
Select confirmed deliveries and state any pending packages. The list is not an appointment reservation or confirmation that building access has been arranged.
| Situation | A practical next step |
|---|---|
| Familiar task | Measure accessible lift and doorway openings without testing an unsafe carry. |
| Multiple or awkward jobs | Avoid building a unit where the completed shape cannot leave the space. |
| Uncertain mounting | Wall attachment must follow the product’s requirements at the final location. |
| Regulated or specialist work | Do not alter a specialist door or fixed service merely to move furniture through. |
DIFFERENT ROOMS, DIFFERENT BRIEFS
Check the apartment’s permitted equipment route.
Show skirting and projections at final positions.
Clarify consent for required furniture restraints.
Identify upstairs destinations before unpacking panels.
Keep workstations available only where agreed.
Verify any lift booking requirements with management.
Homeowner? Prioritise everyday faults.
Landlord or manager? Authorise the repair scope.
Tenant? Obtain permission for alterations.
CLEAR BEFORE YOU BOOK
Compare the package route with the dimensions of the finished furniture.
A small assembly and a tall unit requiring extra handling are different requests.
Include the screen’s carrying route and installation access.
| Task | Pricing basis | Guide |
|---|---|---|
| Repair or fitting | Handling constraints beyond the delivery point | Quotation |
| Small furniture assembly | Small supplied furniture model | From £30 |
| Several small jobs | Multiple builds at their final locations | Combined scope quotation |
| Complex mounting | Screen movement, bracket and wall suitability | Assessment quotation |
Small-item assembly source: Alesta’s furniture assembly page . Other work: individually quoted.
Base the quotation on products present and identified, with later deliveries marked separately. Additional movement, dismantling or disposal should not be presumed within new furniture assembly.
FROM SMALL FIX TO FINISHED JOB
Check package counts against each product listing.
Confirm building access for equipment.
Reserve room to sort the available panels.
Review the actual assembly order before starting.
Record any product delayed by missing components.
START WITH THE TASK
Check every furniture model against its delivered packages.
02 ↗Separate standard storage assembly from custom shelving.
03 ↗Identify doors restricting access to the assembly room.
04 ↗Provide TV handling information beyond delivery access.
05 ↗Include final restraint or accessory fitting requirements.
06 ↗Report damaged components before requesting a repair.
QUICK JOB FINDER
Check every furniture model against its delivered packages.
Explore this service ↗WALK THROUGH THE PROPERTY
ROOM NOTES
Living-room television mounting needs the screen’s route, wall and bracket assessed separately from a delivery booking.
Service details ↗| Job type | Example | Property area | Service |
|---|---|---|---|
| Assembly | Construct a delivered wardrobe | Final room beyond the entrance route | Furniture assembly |
| Mounting | Fit an approved shelf | Accessible wall beside the unit | Fittings |
| Adjustment | Assess a separate door fault | Room entrance on the carrying route | Door repair |
| Timber work | Review tailored storage | Space unsuitable for a standard cabinet | Carpentry |
QUICK ANSWERS
Product quantities, build requirements and access form the scope.
Assembly and appropriate minor fittings can be reviewed from specifications.
Confirm completeness and a practical shared work area.
Agree who supplies materials. Keep the manufacturer’s fittings with the correct product.
The actual delivered list and assembly constraints guide timing.
Furniture assembly is available. Show both the build floor and final position.
Anchoring and mounting need suitable support, not just permission.
Confirm owner consent and building arrangements independently.
A JOB, MADE VISIBLE



Illustration only; not customer evidence.
PLAN THE ARRIVAL
Send the Stratford address and confirmed building entry instructions. Identify any lift arrangements you must make and check appointment availability before reserving them.
Interactive area map
THE DETAILS OF YOUR VISIT
Verify that all relevant packages are physically present and report visible damage before arranging dependent assembly.
No. Confirm the service appointment separately from your building arrangements.
The product’s assembly method and working clearance need review, not just its packaged dimensions.
Identify that item so the feasible scope can be considered without assuming every task must proceed together.
Check completeness while keeping panels, fittings and instructions grouped by model.
Do not assume it. Plan assembly around the final destination and any later handling separately.
Follow manufacturer requirements and resolve suitable fixing and permission before relying on the assembly plan.
Describe known arrangements and confirm how relevant access costs affect the quotation.
Contact Alesta to review the agreed plan rather than assuming the appointment remains workable.
TURN THE LIST INTO A PLAN
Provide an onsite product checklist, the final layout and the building access details as three separate parts of the enquiry.
Images illustrate typical handyman tasks.
