List the models
from every supplier.
Include optional interiors, desk modules and bed mechanisms, not simply retailer names.
MODEL · QUANTITY · INSTRUCTIONSBATTERSEA · APARTMENT FURNISHING
Combine the inventory, not the hardware.
Furniture from different suppliers can arrive with similar-looking fittings that serve different joints. For a Battersea apartment setup, send one complete list while keeping each product’s parts and instructions together.

FURNITURE FROM SEPARATE ORDERS
Select all relevant categories and identify their specific instructions rather than treating similar pieces as interchangeable.
Give wardrobe doors, interiors and restraint requirements with all associated cartons.
Send the mixed-order inventory ↗Show the wardrobe destination and working floor; keep any separately supplied interior kits traceable.
BEDROOM / FRAME & MECHANISMSSpecify the bed model and storage mechanism regardless of where the mattress was purchased.
BEDROOM / SMALL FURNITURECount bedside units and identify differing drawer versions.
STORAGE / RUNNERS & ALIGNMENTProvide chest references and anti-tip instructions; fittings from another brand are not assumed compatible.
DINING / LIVING SPACEDescribe table extensions and protected handling space.
HOME OFFICE / WORKSPACEInclude desk attachments and chair clearance, keeping furniture cable features distinct from equipment work.
DINING / HOME OFFICEState chair models and quantities from each order.
LIVING ROOM / MODULAR STORAGEExplain cabinet arrangements and manufacturer connections or restraints.
SUITABLE FREESTANDING FURNITUREFreestanding shelving needs its own placement assessment; wall-mounted work is separate.
MORE THAN ONE ROOMAllocate every product to a room so the complete list can be sequenced without merging kits.

BATTERSEA ORDER NOTES
Similar screw heads can conceal different lengths or threads. Keep components and instructions linked to the product they belong to rather than creating one mixed hardware box.
State whether the deliveries are inside the rooms or only at the property entrance. Any remaining carrying requires discussion alongside assembly.
ORGANISE THE MIXED ORDER
A combined enquiry should still identify each individual kit and configuration.
Include optional interiors, desk modules and bed mechanisms, not simply retailer names.
MODEL · QUANTITY · INSTRUCTIONSRetain readable labels and report incomplete or damaged deliveries without mixing fittings.
PACKAGE COUNT · DELIVERY COMPLETEExplain whether boxes reached the apartment or only its entrance, with stairs, lifts and carrying requests.
FINAL POSITION · SPACE · ACCESSLARGE COMPONENTS WITHIN THE SETUP
Wardrobe sides and bed panels need supported floor before their final footprints exist. Plan the largest components across the complete inventory.
Check each manufacturer’s sequence against ceiling, doorways and nearby furniture. A completed cabinet may not follow its boxed route.
Normally assess construction in the destination room. Existing-item dismantling, moving and product alterations are separate needs.
ONE APARTMENT, DIFFERENT PRODUCTS
The bed and wardrobe may come from different suppliers but compete for the same assembly floor. Include both in the room plan.
Photograph their intended positions together.
Share the apartment inventory layout ↗Preserve supported panel space until the larger structures are complete, then position smaller pieces.
Show the clear floor beside the wardrobe wall.
LIVING ROOMDifferent collections can still obstruct each other’s doors or the route through the lounge.
Include openings and nearby furniture.
HOME OFFICEIdentify the main desk, chair and separate pedestal, showing their combined operating space.
Photograph the complete workstation position.
DINING AREAA table and separately ordered chairs need their own references and quantities.
Show protected tabletop handling floor.
SIMILAR APPEARANCE, DIFFERENT COMPONENTS
Supplier and model differences can change joints, mechanisms and adjustment stages.
| Furniture type | Construction differences | Identifying details |
|---|---|---|
| Wardrobe | Door systems and interior modules | Wardrobe reference and chosen options |
| Bed | Base hardware and storage mechanisms | Bed model and instructions |
| Desk | Attached pedestals and supports | Desk configuration and modules |
| Storage | Cabinet links and shelf fittings | Individual references and connecting requirements |
QUOTE THE COMPLETE FURNISHING LIST
The actual models, access and agreed work determine the quote, not the number of suppliers or delivery notes.
Starting category for a simple small item.
Typical category for beds, desks or medium storage.
Starting category for large wardrobes or several builds.
| Service scope | Price guide | What informs the total |
|---|---|---|
| Small furniture item | From £30 | Small-kit construction and components |
| Bed, desk or medium storage | Typically £60–£150 | Mechanisms, adjustments and room access |
| Large wardrobe or multi-item project | From £300 | Large structures, interiors and agreed restraint |
Supply, delivery, carrying, dismantling existing furniture and packaging disposal are not presumed. Confirm extra requirements separately within the agreed project scope.
MIXED-ORDER ANSWERS
INVENTORY → SEPARATE KITS → BUILD → REVIEW
Match models, labels and their own instructions.
Protect floor and organise separate component areas.
Follow the relevant manufacturer’s sequence with supported panels.
Check frames before tuning each product’s doors and runners.
Check intended operation and stability, identifying outstanding parts or restraint.
DIFFERENT FITTINGS NEED THEIR OWN SETTINGS
A hinge or runner from one cabinet does not establish how another should be adjusted. Start with each correctly assembled frame.

Use the supplied hinge adjustment design.

Verify each runner system engages properly.
Apply manufacturer-provided levelling features where relevant and check normal movement without forcing.
RESTRAINT ACROSS DIFFERENT PRODUCTS
Include anti-tip information for every relevant cabinet. Similar appearance does not imply the same anchoring method.
Suitable wall fixing requires agreement. Do not use any furniture contrary to mandatory anchoring instructions while restraint is unresolved.

Missing or damaged components may require the correct manufacturer replacement before completion.
Randomly swapping hardware between suppliers’ kits can damage joints and leave several items incomplete.
FROM SEPARATE ORDERS TO CHECKED ROOMS
One project can retain clear boundaries between every product.

Keep labels linked to their models.

Follow each manufacturer’s component sequence.

Check movement and outstanding safety needs.
Images illustrate assembly stages, not an actual customer’s apartment transformation.
WHO KNOWS THE COMPLETE INVENTORY?
Identify a contact who can answer questions across the separate orders as well as provide entry.
Explain existing furniture and request moving or dismantling separately.
Provide all references, keyholder details and responsibility for restraint decisions.
Check relevant attachment permission for the actual products rather than assuming one approval covers all.
YOUR BATTERSEA APARTMENT
Send postcode, floor, entry arrangements and stairs or lift details, with any carrying still requested.
Send inventory and access information ↗Service-area map
Google Maps content loads on selection.MULTI-SUPPLIER QUESTIONS
Battersea enquiries should combine the project information without combining the hardware.
Yes, with every model, quantity and destination declared. Keep each manufacturer’s components and instructions distinct.
Reserve suitable floor for the largest components and keep each kit traceable. Do not fill the build area with unrelated delivery packaging.
The products and scope matter. Guides are small items from £30, beds/desks/medium storage typically £60–£150 and large wardrobes or multi-item work from £300, subject to models and access.
Identify the affected product and outstanding cartons. Other complete orders do not supply interchangeable parts for it.
Assess suitable space in its final room; its completed structure may not pass internal doorways.
Provide the precise frame and mechanism model, not just the mattress size or retailer name.
No. Different lengths or threads can be difficult to see and may damage joints. Keep fittings with their own kit.
List it with the expected delivery status and final room before scope agreement; do not assume availability or completion timing.
State their location, destination rooms and internal route. Remaining carrying needs explicit agreement.
Each product and wall needs assessment against instructions, suitable anchors, concealed services and relevant permission before fixing is agreed.
Identify that manufacturer’s correct replacement. Borrowing a similar part from another order is not a reliable solution.
COMBINE THE PROJECT INFORMATION
Send the full inventory and current delivery locations.

Enter your postcode to see estimated arrival time for your area.
Estimated arrival times are approximate and may vary depending on traffic and technician availability.