Homeowners
Explain existing furniture and request any moving or dismantling separately.
TOOTING · NEW BEDROOM ESSENTIALS
Check the whole order before planning the build.
An order marked partly delivered may still lack the interior fittings needed for completion. For Tooting assembly, compare every package with the chosen bedroom configuration and show the final room.

WHO CAN CHECK THE BEDROOM ORDER?
Identify someone who knows optional selections as well as the person providing entry.
Explain existing furniture and request any moving or dismantling separately.
Provide full configuration details, keyholder and restraint decisions.
Check relevant attachment permission before booking required wall fixing.
READINESS BEFORE THE VISIT
Delivery to the address and readiness for a complete build are different things.
Include wardrobe interiors, bed mechanisms and every smaller bedroom item.
MODEL · QUANTITY · INSTRUCTIONSKeep labels legible and report missing or damaged cartons, including optional fittings.
PACKAGE COUNT · DELIVERY COMPLETEInclude clear working floor, existing furniture and stairs or lifts, with carrying requests explicit.
FINAL POSITION · SPACE · ACCESSTHE BEDROOM ORDER CHECK
Provide complete model details so optional parts and separate packages remain visible.
List wardrobe frame, doors and interior options with their restraint instructions.
Send the complete bedroom order ↗Check every package belonging to the chosen wardrobe, not only the largest panel carton.
BEDROOM / FRAME & MECHANISMSSpecify the bed reference and storage mechanism rather than mattress size alone.
BEDROOM / SMALL FURNITURECount bedside units and drawer versions against the order.
STORAGE / RUNNERS & ALIGNMENTProvide chest references and anti-tip requirements, including its drawer arrangement.
DINING / LIVING SPACEDescribe table mechanisms and protected handling space if included.
HOME OFFICE / WORKSPACEList desk modules and chair clearance for a bedroom workstation.
DINING / HOME OFFICEGive chair models and quantities.
LIVING ROOM / MODULAR STORAGEIdentify cabinets and prescribed connections or restraints.
SUITABLE FREESTANDING FURNITUREFreestanding shelving needs suitable placement; wall-mounted work is separate.
MORE THAN ONE ROOMDeclare all requested products and rooms before planning the sequence.

TOOTING ORDER NOTES
The main wardrobe frame may have arrived while drawers, rails or doors are outstanding. Compare packages with the actual configuration rather than an overall order status.
Show the final bedroom and where the cartons are now. Delivery to the property does not establish that the work area is clear or carrying is complete.
ORDER → PACKAGES → ROOM → BUILD
Match the chosen configuration with instructions and delivered parts.
Protect clear floor and keep kits organised.
Support components and follow the manufacturer’s sequence.
Check frames before setting doors and drawers.
Check normal operation and stability, explaining unfinished components or restraint.
ROOM FOR THE MAIN STRUCTURES
A bed and wardrobe can compete for the same clear floor during construction. Their complete specifications help establish a workable order.
Check the manufacturer’s sequence, ceiling clearance and doorways. A completed wardrobe may not move through the route used by its flat panels.
Normally assess suitable assembly in the final room. Old-furniture dismantling, moving and product alterations need separate agreement.
ORDER READINESS AND ROOM READINESS
A wardrobe may need more construction space than its finished outline. Include the bed and smaller pieces before placing cartons in every gap.
Photograph the full bedroom setup.
Share the bedroom readiness plan ↗Belongings need another place while panels and fittings are being assembled and checked.
Show the clear area beside the wardrobe.
LIVING ROOMCabinet doors and nearby tables should leave the route through the room usable.
Include neighbouring furniture in the view.
HOME OFFICEA separate pedestal can add work and change chair clearance even when the desktop has arrived.
Photograph the complete intended workstation.
DINING AREATable, extension parts and every chair should appear in the inventory.
Show protected tabletop handling floor.
OPTIONAL PARTS CHANGE THE BUILD
Interior drawers and moving bases can add stages beyond the main frame.
| Furniture type | What changes assembly | Details to provide |
|---|---|---|
| Wardrobe | Selected doors and internal modules | Full wardrobe order and cartons |
| Bed | Storage base and mechanism fittings | Exact bed reference and instructions |
| Desk | Pedestal and support sections | Desk configuration with extras |
| Storage | Cabinet links and shelf systems | Individual models and arrangement |
QUOTE THE ORDER YOU ACTUALLY CHOSE
Guide categories do not replace the model details. The complete configuration, access and agreed scope determine the quotation.
Starting guide for a simple small item.
Typical range for beds, desks or medium storage.
Starting guide for large wardrobes or multiple builds.
| Service scope | Price guide | What informs the total |
|---|---|---|
| Small furniture item | From £30 | Small-product construction and fittings |
| Bed, desk or medium storage | Typically £60–£150 | Mechanisms, adjustment and room access |
| Large wardrobe or multi-item project | From £300 | Large structures, chosen interiors and agreed restraint |
Supply, delivery, carrying, dismantling existing furniture and packaging disposal are not assumed. Declare extra requirements before confirming assembly.
ORDER-CHECK ANSWERS
COMPLETE PARTS, CORRECT ADJUSTMENT
Doors and internal drawers should be checked against the assembled carcass rather than assumed correct because all packages arrived.

Set hinge gaps after structure checks.

Confirm runner engagement and smooth travel.
Use supplied levelling features where appropriate and assess ordinary movement without forcing.
RESTRAINT WITH THE CHOSEN CONFIGURATION
A wardrobe’s supplied bracket does not establish which wall anchor is suitable. Discuss required restraint before construction fills the room.
Wall attachment needs suitability and agreement. Do not use furniture contrary to required anchoring instructions while restraint is unresolved.

An absent interior or damaged fitting may prevent the selected product from being completed. Retain references for the correct manufacturer replacement.
Avoid random substitute hardware from another kit or household item.
FROM COMPLETE ORDER TO CHECKED FURNITURE
The chosen configuration guides the entire build.

Keep labels linked to the order.

Support panels and organise the fittings.

Check movement and outstanding safety conditions.
Illustrations show assembly stages, not an actual customer’s bedroom transformation.
YOUR TOOTING BEDROOM LOCATION
Send postcode, floor, entry arrangements and stairs or lift details, with any carrying requested.
Send order and access information ↗Service-area map
Google Maps loads through the selected map.BEDROOM-ORDER QUESTIONS
Tooting enquiries should include optional interiors and the room’s actual readiness.
Compare every package with the selected configuration, including interiors and doors. Identify exactly what remains outstanding.
No. Show the final room, clear working floor and current carton location. Any remaining carrying needs discussion.
The selected configuration matters. Guides are small items from £30, beds/desks/medium storage typically £60–£150 and large wardrobes or multi-item work from £300, subject to models, access and scope.
Yes. A drawer, rail or fitting package may be necessary for the ordered configuration. Report it rather than assuming the main panels are sufficient.
Assess suitable space in its final room; the completed unit may not negotiate the route afterwards.
Provide the exact frame and storage mechanism, not only mattress dimensions or the retailer’s range name.
Start with package references and delivery information. Keep kits identifiable instead of scattering components before preparation.
List all models and quantities upfront so their work and positions are included in the plan.
Describe the route, stairs or lifts and any carrying requested. Do not assume it is covered automatically.
No. Instructions, wall construction, suitable anchors, concealed-service checks and relevant permission must be assessed before agreement.
Identify the correct manufacturer component for the selected model. Completion may depend on replacement rather than unrelated substitute hardware.
CHECK THE COMPLETE BEDROOM CONFIGURATION
Include outstanding packages and any separately requested handling.

Enter your postcode to see estimated arrival time for your area.
Estimated arrival times are approximate and may vary depending on traffic and technician availability.