EAST DULWICH · BEDROOM BUILD ORDER
Prepare a bedroom for tall storage and a new bed.
In an East Dulwich bedroom, the new bed can occupy the very floor needed to build a wardrobe. Plan both products together before treating their assembly as independent tasks.

BUILD A REALISTIC LIST
Put the bed and wardrobe on one plan, with the first-needed item identified. Leave the final wall accessible for the storage unit’s securing stage.
| Situation | A practical next step |
|---|---|
| Simple familiar task | Check the delivery against both product lists before unpacking everything. |
| Several jobs or awkward fitting | Ask for help where the bed and wardrobe compete for construction space. |
| Uncertain wall, load or fixing | Do not improvise upright assembly contrary to the supplied instructions. |
| Gas, structure or fixed electrics | Keep wiring changes outside the bedroom furniture appointment. |
START WITH THE TASK
Sequence bed and wardrobe construction together.
02 ↗Check wardrobe doors against bedside storage.
03 ↗Keep the bedroom entrance usable as panels arrive.
04 ↗Separate wall-screen work from furniture anchoring.
05 ↗Wait for the headboard position before hanging art.
06 ↗Identify any damaged delivered panels before assembly.
QUICK JOB FINDER
Sequence bed and wardrobe construction together.
Explore this service ↗EAST DULWICH IN PRACTICE

Prepare a bedroom for tall storage and a new bed.
Keep the wardrobe’s final wall accessible until its anchoring requirements have been reviewed. A bed moved against that wall too early can obstruct the finishing stage.
Check which packages belong to each item and whether the instructions call for upright assembly. Floor space, ceiling clearance and the remaining furniture all influence preparation.
Explain where the old bed will be during the work. Taking it apart, carrying it away and disposing of it are different requests from assembling the replacement.
Sequence bed and wardrobe construction together; Separate wall-screen work from furniture anchoring; Identify any damaged delivered panels before assembly.
FROM SMALL FIX TO FINISHED JOB
Identify both products and check their complete delivery counts.
Set the bed-and-wardrobe order around their assembly instructions.
Keep the wardrobe wall accessible and the old frame’s destination agreed.
Discuss missing or damaged components before changing the planned construction.
Review furniture operation and the required securing stage before returning the room to use.
CLEAR BEFORE YOU BOOK
Price each new product and any old-bed disassembly separately.
Bed and wardrobe assembly can be requested together; both manuals and package counts inform the reviewed scope.
Wardrobe anchoring needs wall review; picture locations should follow the headboard.
| Task | Pricing basis | Guide |
|---|---|---|
| Repair or fitting | Identify any damaged delivered panels before assembly | Reviewed quote |
| Small furniture assembly | Sequence bed and wardrobe construction together | From £30 |
| Several small jobs | Bed and wardrobe tasks benefit from a shared space plan. | Agreed combined work |
| Complex mounting | Separate wall-screen work from furniture anchoring | Mounting assessment |
For the published small-item guide, see Alesta’s furniture assembly page . Other fitting and repair requests are quoted individually.
Compare the full bed-and-wardrobe scope, including any agreed old-frame handling and securing work. Missing packages or damaged panels may prevent the planned assembly from proceeding unchanged.
DIFFERENT ROOMS, DIFFERENT BRIEFS
measure the route for wardrobe sides.
show skirting at the storage wall.
approve required anchoring before assembly.
state where the old bed will wait.
identify desks remaining in multipurpose bedrooms.
confirm access for bulky packages.
Homeowner? Keep the wardrobe’s final wall accessible until its anchoring requirements have been reviewed. A bed moved against that wall too early can obstruct the finishing stage.
Landlord or manager? Rental permission should cover manufacturer-required furniture attachment, not just delivery.
Tenant? Ask the owner to approve required anchoring before assembly.
WALK THROUGH THE PROPERTY
ROOM NOTES
Separate wall-screen work from furniture anchoring. Reserve elsewhere only for safely stored unopened boxes.
View the relevant service ↗| Job type | Example | Property area | Service |
|---|---|---|---|
| Assembly | Sequence bed and wardrobe construction together | Furniture position | Furniture assembly |
| Mounting | Wait for the headboard position before hanging art | Fitting wall | Fittings |
| Adjustment | Keep the bedroom entrance usable as panels arrive | Opening clearance | Door repair |
| Timber work | Check wardrobe doors against bedside storage | Storage space | Carpentry |
QUICK ANSWERS
Price each new product and any old-bed disassembly separately.
Furniture construction and suitable securing can be reviewed from the manuals.
Bed and wardrobe tasks benefit from a shared space plan.
Keep both products’ complete fittings distinct; confirm anchoring materials beforehand.
The assembly sequence and usable bedroom floor influence the appointment plan.
Bed and wardrobe assembly can be requested together; both manuals and package counts inform the reviewed scope.
Wardrobe anchoring needs wall review; picture locations should follow the headboard.
Rental permission should cover manufacturer-required furniture attachment, not just delivery.
A JOB, MADE VISIBLE



Illustrations explain assembly stages; they do not document a customer project.
PLAN THE ARRIVAL
Provide the East Dulwich postcode and describe the bedroom route for long panels. Confirm availability and any carrying restrictions before dismantling the existing bed or shifting other furniture.
Area orientation
THE DETAILS OF YOUR VISIT
That depends on both manuals and the available working floor. Send the bed and wardrobe details together so one does not obstruct the other.
Only where the product instructions and room allow it. Raising a completed unit also needs clearance; the final height alone is insufficient.
State the manufacturer’s requirement and show the final wall. Do not omit that stage when describing a tall storage assembly.
Explain what remains and what needs moving. Emptying or handling existing contents should not be silently added to the furniture work.
Match the delivery against the product documentation before booking. An incomplete component set may prevent assembly even if the largest panels have arrived.
Disassembly, movement and disposal need separate agreement. The new bed’s assembly price does not establish that those services are included.
The headboard and bedside furniture can change the useful positions. Review that layout first, while keeping each wall fitting subject to suitability.
Explain when the bed is needed and which product has priority. Do not assume a particular completion time before the work is reviewed.
Review doors, drawers and the bed assembly against the agreed products, including required securing work and any components that remain outstanding.
TURN THE LIST INTO A PLAN
Send the bed and wardrobe models together with the occupied bedroom layout. A combined space plan can reveal preparation that separate product enquiries would miss.