The apartment finishing list
Keep the entrance and room connections on the inspection list.
Ealing · Different paint dates need separate readiness checks
Different paint dates need separate readiness checks.
Group ready rooms together and flag any room still awaiting work.
Several decorated rooms may not all be ready for cleaning on the same day. For your Ealing enquiry, describe the rooms released by the decorators. Keep product guidance for rooms painted at different times.

Illustrative renovation scene; no customer job or measured result is represented.
Different project briefs
Keep the entrance and room connections on the inspection list.
Include the kitchen surfaces that remain accessible before storage is filled.
Describe accessible fixtures without assuming treatment of every grout mark.
Include connecting halls when deposits extend beyond the newly fitted areas.
Explain what was refurbished and who can approve the relevant room priorities.
An office enquiry needs confirmation of site access and the proposed cleaning scope.
A useful distinction
Builder stage
Cleaning stage
Ealing / the specific room brief
Several decorated rooms may not all be ready for cleaning on the same day.
This Ealing planning example centres on multi-room decorating completion. Several decorated rooms may not all be ready for cleaning on the same day. The useful inspection route follows the rooms released by the decorators, with attention to painted doors and accessible frame tops.
Keep product guidance for rooms painted at different times. Keep any care notes for painted doors available when discussing the visible marks.
Agree access with the household rather than assuming every bedroom is vacant. Group ready rooms together and flag any room still awaiting work.
A scoped quote
From £29/ hour
Discuss the actual brief against the published starting rate. Standard cleaning equipment and materials are included.
A quotation follows the condition and time required, not the heading on this page. Flag extra work early.
| Project | Pricing basis | What to describe |
|---|---|---|
| Smaller refurbishment | From £29/hour; scope confirmed | Rooms released and cleaning priorities |
| Kitchen or bathroom work | From £29/hour; scope confirmed | New materials and safe access |
| Whole-property renovation | Quote after the room scope is reviewed | Room schedule and surface-care needs |
| Commercial refurbishment enquiry | Quotation after requirements are confirmed | Premises condition and suitability questions |
Based on Alesta’s published after builders cleaning rate. Building waste removal is quoted separately.
Start with the work
A project category helps organise the next conversation. It is not an acceptance of site requirements or a fixed inclusion list.
Explain where the work stopped and where deposits remain; the two boundaries may not be identical.
Beyond the work zone

Do not let the room name decide the dust boundary.
Where rooms open into each other, explain which surfaces carry deposits rather than relying solely on the name of the renovated room.
Explain which coverings remained in place and which surfaces are exposed now. Accessible tasks can then be agreed realistically.
A later sanding visit can undo the sequence. Mention returning trades before arranging the clean.
The dust route
These zones describe a planning approach rather than measured rooms or customer premises.
List reachable horizontal details individually where fitted furniture creates extra ledges.
Room edges often need a deliberate check after the larger surfaces look clear.
Point out visible deposits on the fixtures, rather than adding an undefined deep-clean request.
Check thresholds before deciding that a protected room is outside the affected area.
Different issues / different scope
| Post-build issue | Example | How it is approached |
|---|---|---|
| Fine dust | Settled deposits on exposed horizontal detail | Agreed detail can form part of the finishing clean. |
| Loose cleaning remnants | Ordinary loose residue associated with cleaning | Coverage depends on the agreed cleaning tasks. |
| Adhesive or labels | A bonded patch on new trim | Ask about inclusion after the material has been assessed. |
| Paint, plaster or cement spots | A mark needing material identification | Flag these individually; some need specialist attention. |
| Protective film | A covered face on a new component | This is not automatically part of a cleaning visit. |
Two separate jobs
Use the clean to address the exposed surfaces affected by works, with the specific detail agreed before attendance.
Explain what bulky items remain before a quote is agreed, so cleaning is not confused with removal.
Discuss building waste disposal ↗Room-by-room brief
Include fittings and reachable edges in the kitchen brief instead of assuming an all-inclusive appliance clean.
Describe sanitaryware, tiles and fittings, with fresh sealant and any glass work flagged separately.
Describe exposed frame and floor deposits before adding any storage-interior requirement to the proposed work.
Name exposed ledges and frame detail before furniture makes them harder to reach.
Protect the new finish

Illustrative surface review.
Protecting the finish can mean leaving a difficult mark for assessment.
An apparently minor mark may sit on a sensitive coating. Check the surface specification before including removal in the request.
Wet or uncured finishes need time under the relevant manufacturer guidance.
Identify whether a specialist finish changes the proposed cleaning method.
Record installation marks on new fittings before discussing their removal.
From renovation to room use

Make remaining deposits and obstructions clear.

Carry out the planned finishing detail.

Check the work before the rooms are rearranged.

Arrange the next stage around the reviewed areas.
These images explain stages; they do not show one verified customer project or promise an identical outcome.
At a glance
Build your brief
Keep the initial enquiry concrete and useful.
Entering details here only organises your brief. Contact Alesta separately to discuss suitability and a quote.
Further assessment may be needed for difficult deposits, unusual materials or extras. The planner cannot settle those questions or the final price.
Discuss the brief: 020 3608 3976Who is planning the handover?
Focus the request on the effect of the renovation rather than an undefined whole-house reset.
Keep the post-build room list clear even where another party has a separate inspection checklist.
Do not assume this is a standing commercial agreement. Explain the premises and proposed handover for suitability review.
Glass after renovation

A window list needs height and face information, not simply the number of windows in the room.
A fixed deposit may not be safely removable from the glass finish. Identify it before agreeing ordinary window work.
Plan separate window cleaning ↗Service-area planning
Use the map to locate the Ealing service area, not an Alesta branch. Provide the actual address when asking about access and appointment availability.
For another nearby area, contact Alesta through the main after builders service to confirm coverage and availability.
Before the appointment
Describe the project in terms of accessible surfaces rather than a promise that the property is “finished”. It helps to identify the actual priorities before discussing price or timing. Several decorated rooms may not all be ready for cleaning on the same day.
A clear access note reduces uncertainty about the visit. Include the entry arrangement and any part of the route that still contains construction equipment or household storage. Agree access with the household rather than assuming every bedroom is vacant.
New coatings need informed handling. Identify the material and residue separately so the treatment discussion remains realistic. Keep product guidance for rooms painted at different times.
A protected room may have exposed details that need attention. Explain what you can see rather than assuming either complete exclusion or a whole-home clean. Here, inspect the rooms released by the decorators.
Alesta advertises a starting hourly rate of £29 and includes materials and equipment. Confirm the current rate and the actual work before treating the guide as a quote.
If the project schedule changes, raise it before the cleaning date. Ready surfaces, clear access and an end to dusty work all affect the arrangement.
Construction waste needs its own access and quantity information. Keep it outside the cleaning-rate assumption.
Complete removal is not guaranteed. Fresh-looking glass can carry a coating, while paint or plaster may be firmly attached. Have those marks assessed through the window-cleaning enquiry instead of treating them as ordinary dust.
Give each decorated room its own readiness note where products or painting dates differ. Follow the product instructions before cleaning the new finish. Alesta can discuss the visit once the available rooms and remaining work are clear.
Not every fitting mark is a cleaning task. If removal risks the coating, explain the limitation and consider the appropriate separate advice.
Your project / the final clean
Tell Alesta where the project stands and which surfaces need attention. Timing and price follow an agreed brief.
