How is this priced?
Compare new assembly separately with dismantling, moving and disposing of the old item.
TOOTING · FURNITURE CHANGEOVER
Plan the changeover between old furniture and new.
A new bed arriving at a Tooting home does not create an assembly space by itself. Explain where the old bed will be and when the replacement needs to become usable.

START WITH THE TASK
Separate old-bed disassembly from new-frame construction.
02 ↗Check replacement wardrobe opening space before removal.
03 ↗Keep the bedroom door accessible during the changeover.
04 ↗Avoid placing a removed screen among loose bed parts.
05 ↗Position bedroom pictures after the replacement headboard.
06 ↗Report damage found in delivered panels before assembly.
QUICK JOB FINDER
Separate old-bed disassembly from new-frame construction.
Explore this service ↗QUICK ANSWERS
Compare new assembly separately with dismantling, moving and disposing of the old item.
Suitable construction is distinct from an assumed complete room-clearance service.
Old and new furniture can share a reviewed changeover plan.
Check incoming package completeness before removing the usable old bed.
Product readiness and the changeover sequence determine the appointment plan.
The replacement bed can be assembled after its product and changeover requirements are reviewed; say whether the old frame remains.
Any bedroom wall fittings need separate location and load information.
Confirm ownership and approval before dismantling or removing rental furniture.
TOOTING IN PRACTICE

Plan the changeover between old furniture and new.
Taking apart the existing frame, moving its components and arranging disposal are distinct from constructing the new product. Name each requirement before comparing quotations.
Keep the incoming packages grouped by model and check the delivery count. An apparent complete delivery can still lack the hardware pack needed to begin.
Show the route into the bedroom and any furniture that cannot leave. The proposed changeover should reflect the occupied room rather than an imagined empty floor.
Separate old-bed disassembly from new-frame construction; Avoid placing a removed screen among loose bed parts; Report damage found in delivered panels before assembly.
WALK THROUGH THE PROPERTY
ROOM NOTES
Avoid placing a removed screen among loose bed parts. Identify where displaced furniture will wait.
View the relevant service ↗| Job type | Example | Property area | Service |
|---|---|---|---|
| Assembly | Separate old-bed disassembly from new-frame construction | Furniture position | Furniture assembly |
| Mounting | Position bedroom pictures after the replacement headboard | Fitting wall | Fittings |
| Adjustment | Keep the bedroom door accessible during the changeover | Opening clearance | Door repair |
| Timber work | Check replacement wardrobe opening space before removal | Storage space | Carpentry |
BUILD A REALISTIC LIST
Define the changeover, not just the new product. List old-frame disassembly, handling or disposal only where those services are actually requested.
| Situation | A practical next step |
|---|---|
| Simple familiar task | Verify the replacement delivery before dismantling the current bed. |
| Several jobs or awkward fitting | Ask for planned help where both frames compete for floor space. |
| Uncertain wall, load or fixing | Do not mix old bolts with the new product’s specified hardware. |
| Gas, structure or fixed electrics | Keep electrical and structural alterations outside the furniture swap. |
CLEAR BEFORE YOU BOOK
Compare new assembly separately with dismantling, moving and disposing of the old item.
The replacement bed can be assembled after its product and changeover requirements are reviewed; say whether the old frame remains.
Any bedroom wall fittings need separate location and load information.
| Task | Pricing basis | Guide |
|---|---|---|
| Repair or fitting | Report damage found in delivered panels before assembly | Reviewed quote |
| Small furniture assembly | Separate old-bed disassembly from new-frame construction | From £30 |
| Several small jobs | Old and new furniture can share a reviewed changeover plan. | Agreed combined work |
| Complex mounting | Avoid placing a removed screen among loose bed parts | Mounting assessment |
For the published small-item guide, see Alesta’s furniture assembly page . Other fitting and repair requests are quoted individually.
Ask which old-item tasks are included alongside the new assembly. Missing delivery parts, mattress handling or furniture left in the room can change the agreed preparation and labour.
DIFFERENT ROOMS, DIFFERENT BRIEFS
explain long-component access.
show bedroom projections.
approve disposal of owner furniture.
identify temporary storage for old parts.
retain desks in the room plan.
check furniture-removal access.
Homeowner? Taking apart the existing frame, moving its components and arranging disposal are distinct from constructing the new product. Name each requirement before comparing quotations.
Landlord or manager? Confirm ownership and approval before dismantling or removing rental furniture.
Tenant? Ask the owner to approve disposal of owner furniture.
A JOB, MADE VISIBLE



Illustrations explain assembly stages; they do not document a customer project.
FROM SMALL FIX TO FINISHED JOB
Identify the old frame and the complete incoming product.
Agree disassembly, handling and disposal separately where requested.
Keep new hardware distinct and preserve a usable construction area.
Refer damaged delivery components before revising the changeover plan.
Check the new assembly and record the agreed destination of old parts.
PLAN THE ARRIVAL
Send the Tooting postcode and bedroom carrying route. Confirm availability and the old-furniture arrangements before dismantling the current bed or relying on a delivery-day changeover.
Area orientation
THE DETAILS OF YOUR VISIT
Not automatically. Existing-frame disassembly is another task with its own condition and access requirements, so include it explicitly in the request.
Removal and disposal need separate agreement. Do not infer them from an assembly booking or from the fact that the replacement is arriving.
Confirm the new components and your sleeping arrangements first. The practical sequence should not rely on an incomplete delivery becoming usable immediately.
Explain the available floor and storage positions. Mixing old and new hardware can also create confusion, so keep each product’s components distinct.
Show its dimensions against the proposed wall and nearby fittings. Existing pictures, sockets or bedside furniture may need reconsideration.
Mention it specifically and explain its size and location. A frame assembly description should not silently include all associated moving tasks.
The model and instructions are also needed. Box count helps establish completeness but does not describe the complexity of the furniture.
Record the damage and identify the part before proceeding. The replacement product may need suitable components before assembly can continue.
Describe the old item, the new model, the clear working space and the changeover tasks you want included. State your priority without assuming a completion guarantee.
TURN THE LIST INTO A PLAN
Describe both sides of the furniture swap: what is leaving and what is arriving. Alesta can review the required tasks without assuming removal is included in assembly.
Task images are illustrative.
