
Work completed
Confirm work completion before agreeing the cleaning date.
Acton · Distinguish kitchen fitting marks from settled dust
Distinguish kitchen fitting marks from settled dust.
Review the installation separately from the dust-removal brief.
Internal repairs can leave small patches of residue beside newly installed cabinets. For your Acton enquiry, describe the fitted kitchen and repair locations. Describe each stubborn mark by its surface and location, not simply as a stain.

Illustrative renovation scene; no customer job or measured result is represented.
Start with the work
Begin with the renovation type, then explain what actually remains. The selector is guidance for a discussion.
Start with a room-by-room walk-through. Dust in adjoining spaces matters even where those rooms received no new fittings.
Beyond the work zone

Do not let the room name decide the dust boundary.
Compare low edges with accessible ledges; a quick glance across the floor may not show the full distribution of settled dust.
A clear surface list helps Alesta plan the method and time, including suitable floor care and detail around fittings.
A revised works programme should prompt a review of the cleaning date, rather than an assumption that nothing changes.
Acton / the specific room brief
Internal repairs can leave small patches of residue beside newly installed cabinets.
This Acton planning example centres on kitchen fitting and internal repairs. Internal repairs can leave small patches of residue beside newly installed cabinets. The useful inspection route follows the fitted kitchen and repair locations, with attention to cabinet fronts and repaired-wall edges.
Describe each stubborn mark by its surface and location, not simply as a stain. Keep any care notes for cabinet fronts available when discussing the visible marks.
Explain where spare fittings or remaining materials are stored. Review the installation separately from the dust-removal brief.
A scoped quote
From £29/ hour
Alesta includes materials and equipment for the cleaning; the current price still needs confirmation.
The final figure needs the material, access and detail information. Additional services such as waste or specialist treatment are not assumed.
| Project | Pricing basis | What to describe |
|---|---|---|
| Smaller refurbishment | From £29/hour; scope confirmed | Surface list and visible dust distribution |
| Kitchen or bathroom work | From £29/hour; scope confirmed | Sanitaryware or cupboard exterior detail |
| Whole-property renovation | Individual quotation for the renovation | Room schedule and surface-care needs |
| Commercial refurbishment enquiry | Availability and scope need review | Building restrictions and release dates |
Based on Alesta’s published after builders cleaning rate. Building waste removal is quoted separately.
Finishing-work coordination

Confirm work completion before agreeing the cleaning date.

Use suitable methods across the released areas.

Check the work before the rooms are rearranged.

Prepare for occupation without assuming a guarantee.
This is a visual explanation of stages, not photographic proof of one completed job.
The dust route
A property inspection may reveal different priorities from those pictured here.
Dust on the outside of storage needs a clearer description than “clean the cupboards”.
A fitted room has edges behind and beside units that need an access check.
A bathroom fitting needs a different surface description from a painted radiator.
Connect the room being cleaned with the passage used during the renovation.
Different issues / different scope
| Post-build issue | Example | How it is approached |
|---|---|---|
| Fine dust | Deposits on reachable ledges and external faces | Include the affected locations in the scoped tasks. |
| Loose cleaning remnants | Ordinary loose residue associated with cleaning | Discuss the extent alongside the other surface work. |
| Adhesive or labels | A bonded patch on new trim | A cleaning method cannot be chosen from appearance alone. |
| Paint, plaster or cement spots | Local deposits attached to the surface | No promise is made that every bonded mark will lift. |
| Protective film | A manufacturer’s film on new cabinetry | Ask the installer and Alesta before treating this as waste. |
Two separate jobs
List the surface tasks still required after tools and loose materials have been removed.
A waste enquiry should explain both what remains and how it can leave the property. Keep that separate from surface cleaning.
Discuss building waste disposal ↗Different project briefs
Note deposits beyond the renovated room before calling the property ready for occupation.
Name the worktop material and coating before discussing fitting residue on cabinetry.
Check the readiness of sealants before discussing tiles and sanitaryware detail.
Include connecting halls when deposits extend beyond the newly fitted areas.
Keep agent requirements separate from the renovation-cleaning scope for review.
Set out commercial requirements for discussion, including access and work still outstanding.
A useful distinction
Builder stage
Cleaning stage
Room-by-room brief
Distinguish cupboard exteriors from contents and interiors; describe additional requirements before the scope is settled.
Explain where deposits remain on sanitaryware and tiles, keeping difficult marks and fresh seals clearly identified.
Check reachable frames and floors, and mention any dust inside storage rather than assuming it is included.
Name exposed ledges and frame detail before furniture makes them harder to reach.
Protect the new finish

Illustrative surface review.
A stubborn spot does not justify a harsher method.
Describe existing scratches or discolouration before the visit. A finishing clean addresses agreed residue; it does not refinish an installed surface.
Keep newly applied sealants outside cleaning work until their instructions permit it.
Provide floor or tile care notes alongside the room list.
Point out delicate hardware rather than grouping it under general dust.
At a glance
Build your brief
Use the questions to collect the essentials.
This tool keeps the plan on your device. It neither sends an enquiry nor calculates a price or books a visit.
The planner cannot assess a finish or access route; these details still need review before the quotation.
Discuss the brief: 020 3608 3976Who is planning the handover?
Focus the request on the effect of the renovation rather than an undefined whole-house reset.
Identify the person releasing the property and separate renovation priorities from other letting requirements.
Share the practical site details so availability and coordination can be discussed for that particular enquiry.
Glass after renovation

Specify the glazing you mean, including height and whether the request concerns its inside, outside or frame.
The deposit and glass finish both matter. Some construction marks may need separately assessed treatment.
Plan separate window cleaning ↗Service-area planning
Use the map to locate the Acton service area, not an Alesta branch. Provide the actual address when asking about access and appointment availability.
For another nearby area, contact Alesta through the main after builders service to confirm coverage and availability.
Before the appointment
An account of the actual room condition is more useful than a renovation label. Explain the dust and detail that remain once tools are out. Internal repairs can leave small patches of residue beside newly installed cabinets.
The key question is whether the surfaces proposed for cleaning can actually be reached. Identify the person responsible for releasing rooms and clarifying any building entry rules. Explain where spare fittings or remaining materials are stored.
A material-specific decision comes before treatment. Describe the coating and provide relevant guidance; cleaning is not a promise to erase installation defects. Describe each stubborn mark by its surface and location, not simply as a stain.
Another room is relevant when it shows renovation effects, but the quotation must include it explicitly. Explain the affected detail. Here, inspect the fitted kitchen and repair locations.
The published guide begins at £29/hour, with cleaning equipment and materials included. The figure is not a total for the property: condition, access and required detail still need review.
The final clean should follow dusty tasks. If another installation is still due, explain it before booking so the room sequence can be reviewed.
Ordinary cleaning residue differs from construction waste. Give the waste details separately so collection and cleaning responsibilities remain clear.
Do not fold extra services into a vague whole-property instruction. Keep carpet and glazing needs visible in the scope discussion.
The time depends on more than room count. Allow the discussion to cover fittings and access as well as any product-specific drying requirements. Review the installation separately from the dust-removal brief.
Discuss the remaining deposit rather than repeatedly treating it. Some finishes need supplier advice or a separately scoped specialist approach.
Your project / the final clean
Use the project details to start a quotation discussion, keeping difficult surfaces and separate services visible from the outset.
