The return to an empty flat
An empty flat still needs its approach and connecting spaces included where dust is visible.
St James’s · Cabinet detail before the room is furnished
Cabinet detail before the room is furnished.
Agree the clean before furniture makes low edges harder to reach.
New storage can look finished while dust remains on its outside edges and adjacent flooring. For your St James’s enquiry, describe the unfurnished room around fitted storage. Do not assume internal compartments or removal of protective film are included.

Illustrative renovation scene; no customer job or measured result is represented.
Different project briefs
An empty flat still needs its approach and connecting spaces included where dust is visible.
External units and surrounding floor edges can need attention after installation.
Check the readiness of sealants before discussing tiles and sanitaryware detail.
Separate the released rooms from areas still occupied by tools or materials.
Tenant turnover does not automatically turn this into an end-of-tenancy checklist.
Alesta must confirm suitability for the premises and any requested project coordination.
A useful distinction
Builder stage
Cleaning stage
St James’s / the specific room brief
New storage can look finished while dust remains on its outside edges and adjacent flooring.
This St James’s planning example centres on interior refresh before furnishing. New storage can look finished while dust remains on its outside edges and adjacent flooring. The useful inspection route follows the unfurnished room around fitted storage, with attention to coated cabinet fronts and shelf lips.
Do not assume internal compartments or removal of protective film are included. Keep any care notes for cabinet coatings available when discussing the visible marks.
Choose the entrance that keeps equipment clear of delivered boxes. Agree the clean before furniture makes low edges harder to reach.
A scoped quote
From £29/ hour
Cleaning materials and equipment are included; confirm the current rate with the proposed work.
Explain the room sizes, access and finishes before expecting a total. Specialist issues and building materials need their own scope.
| Project | Pricing basis | What to describe |
|---|---|---|
| Smaller refurbishment | From £29/hour; scope confirmed | Finish readiness and access to details |
| Kitchen or bathroom work | From £29/hour; scope confirmed | Installed surfaces and any fitting marks |
| Whole-property renovation | Quote after the room scope is reviewed | Floor materials and accessible detail |
| Commercial refurbishment enquiry | Discuss premises before a quote | Coordination needs requiring confirmation |
Based on Alesta’s published after builders cleaning rate. Building waste removal is quoted separately.
Start with the work
Use a category as a starting point, not a promise that all listed work applies to the property.
For extensive works, note the sequence in which areas become available. Match cleaning priorities to released surfaces and their care requirements.
Beyond the work zone

A clean-looking centre can hide dusty edges.
A narrow approach can connect several spaces. Describe visible dust there even if the contractor worked behind one closed door.
Explain which coverings remained in place and which surfaces are exposed now. Accessible tasks can then be agreed realistically.
Tell Alesta about unfinished tasks instead of assuming the clean covers deposits created afterwards.
The dust route
A property inspection may reveal different priorities from those pictured here.
External shelves and sill tops can reveal deposits missed from the doorway.
A fitted room has edges behind and beside units that need an access check.
Name the fixtures affected by the work so their material and accessibility can be assessed.
The exit route may need attention even where no building work occurred.
Different issues / different scope
| Post-build issue | Example | How it is approached |
|---|---|---|
| Fine dust | Fine material along the room perimeter | Include the affected locations in the scoped tasks. |
| Loose cleaning remnants | Small surface deposits after the work | Ask for affected areas to be recorded in the brief. |
| Adhesive or labels | Transfer left on a cabinet coating | A cleaning method cannot be chosen from appearance alone. |
| Paint, plaster or cement spots | Local deposits attached to the surface | A difficult spot may remain if removal is unsuitable. |
| Protective film | A covered face on a new component | Check installer instructions and confirm whether removal is included. |
Two separate jobs
Cleaning tackles the post-work condition of specified surfaces, rather than emptying the room of building supplies.
Explain what bulky items remain before a quote is agreed, so cleaning is not confused with removal.
Discuss building waste disposal ↗Room-by-room brief
Identify newly installed worktops and the surrounding suitable floor care, with residue assessed against its surface.
Explain the readiness of new sealants and the accessible fixture surfaces proposed for cleaning.
Include the exposed surfaces affected by renovation, with any separate storage detail identified.
Include the living-space edges affected by nearby work and identify unusual finishes before methods are discussed.
Protect the new finish

Illustrative surface review.
Manufacturer guidance matters more than a finish looking dry.
An apparently minor mark may sit on a sensitive coating. Check the surface specification before including removal in the request.
Keep newly applied sealants outside cleaning work until their instructions permit it.
Flag transitions between finishes before suitable floor care is agreed.
Explain which faces of the fitted units are accessible for the agreed clean.
The final-stage sequence

Set out what has finished and what remains.

Address the identified deposits within the agreed work.

Compare completed detail with the agreed priorities.

Coordinate the intended return to the rooms.
These images explain stages; they do not show one verified customer project or promise an identical outcome.
At a glance
Build your brief
Keep the initial enquiry concrete and useful.
The page creates a private planning note only. It does not transmit data, calculate a quote or reserve a cleaning slot.
The output does not judge surface condition. Discuss its details directly, including separate waste and window requirements where relevant.
Discuss the brief: 020 3608 3976Who is planning the handover?
Tell Alesta where you are still living and what can be made accessible after the works.
Provide a clear point of contact for the post-work scope and keep any unrelated inspection duties separate.
Describe remaining trades and site access, then ask about project coordination; contractor arrangements require confirmation.
Glass after renovation

Tell Alesta where the glass is and how it can be reached; additional window work requires confirmation.
A glazing enquiry should identify stubborn spots individually, without assuming every residue can safely be removed.
Plan separate window cleaning ↗Service-area planning
Use the map to locate the St James’s service area, not an Alesta branch. Provide the actual address when asking about access and appointment availability.
For another nearby area, contact Alesta through the main after builders service to confirm coverage and availability.
Before the appointment
Describe the last activity in the space and the surfaces it affected. This avoids asking for a package unrelated to the condition on arrival. New storage can look finished while dust remains on its outside edges and adjacent flooring.
Do not rely on the postcode to explain access. Tell Alesta how the property is entered and which internal areas are available at the proposed time. Choose the entrance that keeps equipment clear of delivered boxes.
A finish can be newly installed without being ready for cleaning. Check its care guidance, explain the visible residue and avoid assuming that every mark can safely disappear. Do not assume internal compartments or removal of protective film are included.
The brief can cross the building-work boundary. That should follow the condition observed, not an automatic assumption about the entire property. Here, inspect the unfurnished room around fitted storage.
The published guide begins at £29/hour, with cleaning equipment and materials included. The figure is not a total for the property: condition, access and required detail still need review.
If the project schedule changes, raise it before the cleaning date. Ready surfaces, clear access and an end to dusty work all affect the arrangement.
Rubble and leftover building supplies need their own quotation discussion. A room full of materials is not equivalent to an accessible room with settled dust.
No. A mark from installation may be bonded to the glazing, and suitable treatment depends on the surface. Include its location and condition in a separate window enquiry rather than assuming an ordinary clean will remove it.
Timing needs both the work list and readiness information. A dry-looking coating or small room does not establish how long the visit should take. Agree the clean before furniture makes low edges harder to reach.
Discuss the remaining deposit rather than repeatedly treating it. Some finishes need supplier advice or a separately scoped specialist approach.
Your project / the final clean
Bring the work history and material notes rather than an assumed package. Confirm the tasks and arrangements before proceeding.
